Define skilled construction and repair of mortar-free walls, including careful stone reuse, stable bonding, historic evidence and boundary controls.
This contract includes Dismantle, sort and retain reusable stone under the repair brief. Prepare foundations and build faces, hearting and batter to approved sections. Select and place bonding, through and coping stones for stability. Preview before payment PDF and editable DOCX files after checkoutBuilt for UK employers
Looking for a Dry Stone Waller employment contract? This page takes you straight into the role-specific builder, with preview before payment and both PDF and DOCX files included after checkout.
Solicitor-approved framework Preview Before Payment £19.99 one-off PDF & editable Word Industry-specific clauses Secure Stripe payment
1,881Role-specific contract paths
GuidedHR Action journeys
40Industries supported
UK-focusedEmployment guidance
Secure payments by Stripe Data handling controlsUK employment contextClear product and advice boundaries
Legally validated and solicitor-approved contract framework
Reviewed for straightforward UK employer use
This page is maintained for UK employers creating dry stone waller contracts for specialist construction. HRHeaven uses a legally validated and solicitor-approved self-service contract framework, with wording for role duties, confidentiality, notice, holiday, probation and practical workplace expectations. It does not replace individual legal advice for complex or disputed circumstances.
Last updated
19 June 2026
Content owner
HRHeaven employment documentation team
Review standard
UK employer template review, versioned clause logic and preview before payment
Free e-sign included
Send the completed contract for signature from your HRHeaven workspace without buying a separate signature tool.
Employer dashboard
Store contracts, track signature status, download signed PDFs, and keep employee documents in one secure dashboard.
Free branding
Add your company name, logo and brand colour so the contract looks like it came from your business.
What's included in your contract
Job description
Clear role overview and key responsibilities.
Probation period
Clear probation terms for the selected arrangement.
Role-specific duties
Maintained responsibilities, records and authority boundaries for the selected role.
Working hours
Standard and flexible working arrangements.
Holiday entitlement
Holiday terms explained for the selected arrangement.
Confidentiality
Client and company confidentiality.
Disciplinary process
Clear process and employee rights.
Notice periods
Notice terms explained for both parties.
You’ll receive your contract in both PDF & DOCX formats
Download a polished PDF ready to issue and an editable DOCX copy for future updates.
PDFReady to use
DOCXFully editable
Before you create it
Use this Dry Stone Waller contract with confidence
Practical checks to help an employer choose the right starting point and prepare the information the document needs.
When to use this contract
Deliver stable dry-stone walls with sound bonding, careful reuse and selection of stone, and finished lines, features and boundaries to the brief.
Workplace context: Construction sites, project offices, client sites and approved work locations.
What makes this role different
Follow the Employer's documented arrangements covering outdoor and remote work. Follow the Employer's documented arrangements covering stone handling. Follow the Employer's documented arrangements covering heritage and boundary care. Follow the Employer's documented arrangements covering material source and reuse. Follow the Employer's documented arrangements covering site rules.
Not a fit / obtain specialist advice
Recheck the role or obtain appropriate advice if the work would exceed these maintained authority boundaries: The waller may select placement within the approved style and section. Boundary relocation, historic-feature removal, imported stone substitution and foundation change require client or conservation approval. May allocate routine work and make operational decisions only within documented staffing, financial, contractual and policy limits.
What to prepare before you issue it
the new-build, repair, boundary or heritage work covered
the sites, travel, remote access and weather arrangements
the walling style, stone and workmanship requirements
the lifting aids, tools, PPE and welfare provided
the survey, photograph and retained-material records required
the authority for boundary, foundation and stone-source changes
Day-to-day operating brief
What Dry Stone Waller work looks like in practice
A dry stone waller selects and places stone without mortar to create stable faces, hearting, through-stones and coping suited to local material and ground. The contract should cover manual handling, heritage or landscape requirements and approval before altering existing walls or boundaries.
Responsibilities reflected in the contract
Dismantle, sort and retain reusable stone under the repair brief.
Prepare foundations and build faces, hearting and batter to approved sections.
Select and place bonding, through and coping stones for stability.
Protect boundary markers, landscape features and historic evidence.
Manage manual handling, access and materials at remote outdoor locations.
Record discoveries, source changes, progress and completed wall condition.
A realistic working scenario
Dismantling reveals a historic feature and foundation conditions differ from the repair brief. The waller records the construction and stones, protects reusable material and seeks conservation or client direction before rebuilding.
Outputs to agree
stable dry-stone walls with sound bonding
careful reuse and selection of stone
finished lines, features and boundaries to the brief
Records and evidence
Location, survey and repair brief.
Stone source and retained material.
Foundation or heritage discovery.
Progress photograph and completion note.
Work records.
Handover notes.
Reporting relationship
Typically reports to Line Manager or Department Manager. Confirm the employer's actual reporting structure in the builder.
Authority and escalation
The waller may select placement within the approved style and section. Boundary relocation, historic-feature removal, imported stone substitution and foundation change require client or conservation approval.
May allocate routine work and make operational decisions only within documented staffing, financial, contractual and policy limits.
Supervision
Dismantle, sort and retain reusable stone under the repair brief.
Allocate and review assigned work within delegated authority and escalate formal people matters through the Employer's procedures.
Tools and systems
Site records.
Project systems.
Risk assessment records.
Workplace context
Construction sites, project offices, client sites and approved work locations.
Training and certification
Complete employer-required health and safety training.
Contract priorities
outdoor and remote work
stone handling
heritage and boundary care
material source and reuse
Information the employer should prepare
the new-build, repair, boundary or heritage work covered
the sites, travel, remote access and weather arrangements
the walling style, stone and workmanship requirements
the lifting aids, tools, PPE and welfare provided
the survey, photograph and retained-material records required
the authority for boundary, foundation and stone-source changes
Individually written and reviewed against the maintained role record.
Maintained role evidence
The facts this Dry Stone Waller contract is built around
These role-pack details give an employer something concrete to check before using the contract for specialist construction work.
Work setting
Construction sites, project offices, client sites and approved work locations.
Primary duties
Dismantle, sort and retain reusable stone under the repair brief.
Prepare foundations and build faces, hearting and batter to approved sections.
Select and place bonding, through and coping stones for stability.
Protect boundary markers, landscape features and historic evidence.
Tools and training to confirm
Site records.
Project systems.
Risk assessment records.
Complete employer-required health and safety training.
Governance focus
HSE context where applicable. Follow the Employer's documented arrangements covering outdoor and remote work. Follow the Employer's documented arrangements covering stone handling. Follow the Employer's documented arrangements covering heritage and boundary care.
Contract builder output
Dry Stone Waller clauses and builder inputs
HRHeaven builds the contract from the employer's answers, the selected industry, and the role-specific wording for this job.
Role wording
Dry Stone Waller duties
Deliver stable dry-stone walls with sound bonding, careful reuse and selection of stone, and finished lines, features and boundaries to the brief.
Dismantle, sort and retain reusable stone under the repair brief. Prepare foundations and build faces, hearting and batter to approved sections. Select and place bonding, through and coping stones for stability. Protect boundary markers, landscape features and historic evidence. Manage manual handling, access and materials at remote outdoor locations.
Builder answers
What the contract builder captures
Employer and employee details Role title and reporting line Pay, hours and working pattern Holiday, probation and notice Workplace and site rules Company branding and e-sign
Preview before purchase
Complete the builder, check the document output, then pay only when you are ready to download.
Specific clauses
What is added to the finished contract
The waller may select placement within the approved style and section. Boundary relocation, historic-feature removal, imported stone substitution and foundation change require client or conservation approval.
May allocate routine work and make operational decisions only within documented staffing, financial, contractual and policy limits.
Follow the Employer's documented arrangements covering outdoor and remote work.
Follow the Employer's documented arrangements covering stone handling.
£19.99 one-off contractPreview before payment, then download the branded PDF and send for signature.
Explore the catalogue
Related roles in Specialist Construction
Compare nearby role contracts before choosing the wording that matches the work.
Once the Dry Stone Waller contract is created, HR Actions help specialist construction employers manage the next HR steps: recruitment, probation, performance, absence, disciplinary, grievance and offboarding.
Choose the right level of support
Single HR Action or Unlimited
Buy one HR Action for one employee process, or use HR Actions Unlimited when you expect recurring HR work.
Keep the context together
AI Workspace support
HRHeaven can pre-fill known employee, role, timeline and document facts, then asks the employer to confirm the missing details.
Stay ready for the next step
Timeline, reminders and audit
Each workflow keeps the case history, source context, reminders, documents and completion summary together.
Can stone from another source be mixed into the wall?
Only after the relevant appearance, performance and client or conservation approval.
What if a historic feature is uncovered?
Protect and record it and obtain direction before removal or reconstruction changes its evidence.
Can a Dry Stone Waller relocate an existing boundary line?
No. The employee should follow surveyed or instructed limits and refer uncertainty to the client or project authority before dismantling or rebuilding.
Who approves a change to the wall foundation?
Changed ground, width, drainage or foundation treatment should be recorded and agreed through the responsible design, conservation or client route.
How should reusable stone be managed during dismantling?
Sort and protect suitable face, through, coping and hearting material in a way that preserves provenance and supports the approved rebuilding sequence.
May imported stone be mixed into a repair?
Only after the required appearance, geology, durability and heritage or client approval, with its source and placement recorded where necessary.
What if wildlife is discovered within a wall?
Pause the affected work, protect the area and use the project's ecological or site route before disturbing a nest, shelter or protected species.
Can remote-site working be included?
Yes. Define travel, vehicles, lone-working checks, communications, weather stoppage, welfare and arrangements for moving stone to inaccessible locations.