The Trommel Operator may stop the trommel and raise an escalation for: detected equipment defects (belt tear, screen damage), unsafe equipment use, excessive contamination in output or missed handover. The operator must not authorise major repairs, reject contractual deliveries to clients without prior approval from the site manager or raise commercial credits; those require approval from the named site manager or commercial contact. The operator can authorise routine maintenance requests, tag equipment out of service and lodge defect reports in the asset library or production system.
Obtain approval before committing expenditure, changing contractual commitments or making regulated or staffing decisions outside the assigned role.
Follow the Employer's documented arrangements covering perform trommel operator work planning, execute shift checks and complete run sheets and handovers accurately.
Inspect trommel components, record defects and stop operations for unsafe equipment conditions.